title: Migrate
description: Migrate executes approved migration waves with runbooks, cutover control, and validation to deliver stable workload transitions.
hero:
  tagline: Migrate executes approved R-strategy transition paths in controlled waves and secures stable cutover outcomes.
  illustration:
    name: product
    position: left
sidebar:
  label: Overview
  order: 0
source_url: "https://framework.stackit.cloud/migration/migrate/"
source_file: "docs/migration/migrate/index.mdx"
---

## Understanding This Phase

Migrate is the phase where migration happens for R-strategy paths that involve a technical move.
It uses a factory-based delivery model to
move workloads in controlled waves from source environments to STACKIT target environments.

The phase is runbook-driven and focuses on repeatability, cutover quality, and stable
handover into operations.

## R-strategy scope in this phase

Migrate does not look the same for every R-strategy decision. The phase focus depends on the
selected path per workload:

- **Relocate, Rehost, Replatform**: These are the core migration paths in this phase and use wave delivery with runbooks.
- **Refactor**: This is usually run as a dedicated modernization project stream with its own backlog and delivery setup.
- **Repurchase**: This follows a different transition pattern and is often best handled as a dedicated workstream or module.
- **Retain, Retire**: These paths do not require migration run in this phase and are treated as portfolio decisions.

## When Migrate starts and ends

Migrate starts when the first migration waves are approved and their runbooks are ready.

<Steps>

1. Start with validated wave scope, target architecture decisions, and operational cutover plans.
2. Execute migration waves with governance controls, technical validation, and rollback readiness.
3. End per workload group when migrations are completed and post-cutover stabilization is accepted.

</Steps>

At program level, the phase ends when all planned workloads are migrated, modernized, or
formally retained/retired according to scope decisions.

## Why this phase matters

Migrate is where migration value is realized in production. Delivery quality in this phase
directly impacts business continuity, user trust, and long-term operating efficiency.

<CardGrid>
  <Card title="Controlled cutovers">
    Standardized runbooks and wave governance reduce outage and rollback risks.
  </Card>
  <Card title="Factory scale">
    Reusable migration patterns increase throughput while preserving quality.
  </Card>
  <Card title="Measured validation">
    Technical and functional checks confirm target-state stability after each wave.
  </Card>
  <Card title="Continuous improvement">
    Lessons learned are fed back into upcoming waves, optimize cycles, and modernization paths.
  </Card>
</CardGrid>

## Core modules in this phase

- [Migrate](/migration/migrate/migrate/overview/): Delivers workload relocation and cutover in controlled migration waves.
- [Optimize](/migration/migrate/optimize/overview/): Improves workload sizing, performance, and cost after migration.
- [Refactor](/migration/migrate/refactor/overview/): Enables deeper restructuring and cloud-native improvements where required.
- [Repurchase](/migration/migrate/repurchase/overview/): Covers SaaS replacement transition patterns that differ from technical migration waves.
- [Operating Model Handover](/migration/migrate/operating-model-handover/overview/): Validates Target Operating Model ownership and transfer readiness before full Run operations.

## Typical outcomes

At the end of Migrate, the program should have:

- **Successful wave run**: Approved waves completed with documented cutover and validation evidence.
- **Stabilized target workloads**: Migrated systems running reliably on STACKIT with defined ownership.
- **Optimization backlog and actions**: Rightsizing and performance improvements prioritized and implemented.
- **Modernization decisions**: Refactor paths identified and initiated where business value is highest.

## Boundary to run

Migrate includes immediate post-cutover stabilization and optimization loops. Long-term service
operations, life cycle governance, and sustained value realization are anchored in the subsequent
Run phase.